2560003

a 10-year permission for the development of a solar farm on a site of 222.23 hectares consisting of the following: 745,168 sq. metres of solar photovoltaic panels on ground mounted steel frames; 23 no. inverter/transformer stations; underground power and communication cables and ducts; boundary security fencing; 1 no. Medium Voltage (MV) Ring Main Unit (RMU) Control Building; new internal access tracks and associated drainage infrastructure; continued use of existing site entrances off the L-4106 and L-13101 local roads; CCTV/Lighting posts; landscaping and all associated site services and works. The project will also include biodiversity enhancement and bat/bird and archaeological buffers within the site. The development is located proximate to Killough Castle and Tower House, which is a Protected Structure (TRPS 1029). Temporary works to the existing splayed entrance onto the L-4106 are proposed to accommodate construction works for the solar farm. The solar farm will be operational for 40 years

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.