2560168
The development will consist of: • Construction of a five storey over split level basement building, with top floor set-back, to provide 25no. short term tourist letting accommodation units consisting of 24no. 1 bedroom and 1no. 2 bedroom units); To include ESB substation, common room, reception and staff facilities at ground floor and common room, gym and plant room at fourth floor level; • To include external terraces at ground floor to the rear serving common room and accommodation units; external balconies at first, second and third floors to the front and rear serving accommodation units; external roof terraces at fourth floor serving common room and gym to the rear / side and serving accommodation units to the front / side at this level; • Split basement level to provide 18no. car spaces accessed through new opening from Distillery Quay apartments basement car park and using the existing ramped entrance off Mill Lane; To include bins store, plant room and 18no. secure bike spaces at basement level; • Externally, works will also include 3 no. on-site street level car parking spaces, 23no. bike spaces and external platform lift to front at street level; steps / footpaths to the front and side; in-ground car park natural ventilation grilles to the front, side and rear; • To include all associated site, landscaping, drainage works and ancillary works necessary to facilitate the development.