Planning permission to construct 8 No. units, three-bed two-storey dwellings, 16 parking spaces a new connection to water and sewage mains and all associated site works all at Moyvane North, Moyvane, Co.Kerry

Refused

Core Refusal Reason

The proposed development is premature due to the lack of capacity in the existing Moyvane Wastewater Treatment Plant (WwTP).

Decision Maker's Conclusion

  • The existing Moyvane Wastewater Treatment Plant is currently operating above its design capacity, and Uisce Éireann has no current plans for necessary upgrades.
  • The proposed connection is considered premature pending the delivery of infrastructure improvements to the local sewerage network.
  • Granting permission would be prejudicial to public health and would conflict with the proper planning and sustainable development of the area.

Cited Policies (CDP)

Kerry County Development Plan 2022-2028Listowel Municipal District Local Area Plan 2020-2026 (Zoning M4 - Built Up Area)

Decision Document Summary

Bryan Stack sought planning permission for the construction of 8 three-bed two-storey dwellings and 16 parking spaces on a 0.27ha site in Moyvane North, Co. Kerry. While the site is located within the village boundary and zoned for development, the application was refused by Kerry County Council. The refusal is based on a report from Uisce Éireann stating that the local Wastewater Treatment Plant is at capacity with no planned upgrades, making the development premature and potentially harmful to...