2560220

10-year planning permission for development at the existing Navan Wastewater Treatment Plant (WwTP). The development comprises upgrades to increase the capacity of the existing WwTP and consists of the following works: two new covered primary settlement tanks; new final (secondary) settlement tank; new sludge liquor buffer tank; new thickened sludge holding tank; new holding tank for alum sludge imports; additional centrifuge; replacement and refurbishment of screens, pumps and associated parts; application of covers to existing primary settlement tanks; upgrade of ventilation system and installation of odour control unit; provision of a containerised standby generator; construction of below ground storm attenuation tank; decommissioning of redundant sludge digestor tanks and related equipment; site access upgrades, and all ancillary landscaping and site development works above and below ground An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted to the planning authority with this application

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.