3750/23

Permission for development at this (c. 0.113 ha) site. The development will consist of the demolition of the existing building on site (c. 2,155.9 sq.m) and the construction of a 7 storey (over basement) hotel (total height c. 22.45 metres above ground level) with setback upper floor (including external terrace), providing 195 bedrooms with reception gallery and restaurant, patio area and garden at the western elevation at ground floor level, cycle parking accessed from Camden Row, plant and staff facilities at basement and ground floor level, landscaping, waste storage area at the eastern elevation at ground level, alongside substation and switch room (accessed via undercroft from Camden Row), sedum green/ blue roof and all associated works to facilitate the development. The total gross floor area proposed is c. 5,511.1 sqm including a c. 614.4 sqm basement.

No decision recorded
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.

PDF Document Missing

The original decision document for this case could not be linked. This often happens for older cases or those with restricted documentation.