2560134
demolish existing redundant structures and construction of new (1) inlet works, (2) aeration tanks and clarifiers with flow splitter chamber, air blowers, sludge wasting pumps and sludge return pumps; (3) sludge drying reed beds; (4) Upgrades to mechanical and electrical components of existing tanks; (5) Installation of a GRP kiosk to house electrical control panel; (6) erection of new boundary fencing around the site; and all ancillary site works. A Natura Impact Assessment (NIS) have been submitted with this application.
Granted
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original