for a period of 10 years to construct and complete a solar PV energy development with a total site area of 45.9 hectares, comprising of the construction of PV panels mounted on metal frames, transformer stations, GRP unit, internal access tracks, perimeter fencing with CCTV cameras and access gates, electrical cabling and ducting, temporary construction compound, landscaping and all ancillary infrastructure and associated works. The solar farm would be operational for 35 years. The export capacity to grid is estimated to be c. 35MW MEC. A Natura Impact Statement (NIS) has been prepared in respect of this application
Core Refusal Reason
The application was supported by substandard and inadequate assessments regarding ecology, traffic safety, and the visual impact on a protected heritage structure.
Decision Maker's Conclusion
- The ecological documentation, including the Natura Impact Statement and AA Screening, is deficient in baseline data and fails to adequately assess impacts on hydrologically connected European sites and local wetlands.
- The applicant failed to demonstrate that the local road network, specifically the narrow L5004, can safely accommodate the projected 1,268 HGV deliveries without significant upgrades and the provision of passing bays.
- The proposal lacks a comprehensive assessment of the visual and heritage impacts on the adjacent Protected Structure, Kilglass House (RPS B03-08), whose attendant grounds are partially located within the application's redline boundary.