2560139

Material alterations to the external envelope of the new 50 Bed unit building, including the removal of 950mm step in the north façade. The reduction in height of all ensuites roof parapet levels, omission of one number north balcony, addition of the coloured render inserts between windows at all levels. Removal of rendered parapet and replacement with metal balustrade above the glazed curtain wall elements to all facades. The construction of a new Boiler House located at the south of the 50 Bed Unit, a new maintenance access road. Replacement of existing non-compliant ramps to the rear (south) of the existing Nursing Unit including all associated site and landscape works. Permission was granted for the new 50 bed unit for the replacement of existing beds including support services, associated site works, reconfiguration/upgrade landscaping works and associated minor works.

No decision recorded
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.