2560068

a quarry development, at Coolnapish, Bagenalstown, Co. Carlow on behalf of Milford Quarries Ltd., comprising of: (a) The excavation of 114,000 m3 of sand and gravel (no processing), over an extractive area of 2.11-hectares at an average annual rate of circa 40,000 tonnes, over a 5-year period (i.e. circa 190,000 tonnes overall). (b) Construction of a new splayed entrance and access road. (c) Construction of a perimeter berm within a 5m-wide strip immediately adjacent to and outside the extractive area, all within the overall development area of 2.49-hectares. (d) Construction of a wheelbath. (e) All associated site works and services to facilitate the development. A five-year term is sought for extraction and an overall development period of eight years is sought to allow for preparatory site works and completion of restoration works. A Natura Impact Statement has been prepared in respect of the proposed development and is submitted with the Application

Refused

Core Refusal Reason

The application was refused due to insufficient information to rule out significant adverse impacts on protected European sites, local hydrology, residential amenity, and the high-sensitivity landscape character of the area.

Decision Maker's Conclusion

  • The applicant failed to provide a complete Natura Impact Statement and EIA Screening Report, leaving the Planning Authority unable to rule out significant negative impacts on the River Barrow and River Nore SAC and the wider environment.
  • The proposal lacked adequate technical assessments regarding noise, dust, ground stability, and hydrogeology, posing an unacceptable risk to residential amenities, private wells, and public health.
  • The development was deemed incompatible with its location in a Class 4 high-sensitivity landscape and failed to adequately assess pedestrian safety and impacts on the Turas Columbanus walking route.

Cited Policies (CDP)

Policy NS. P1Policy NS P2Policy EI P5Class 4 - Increasing Landscape SensitivityPolicy R. P12

Decision Document Summary

Milford Quarries Limited proposed a sand and gravel quarry development on a 2.49-hectare site at Coolnapish, Bagenalstown, Co. Carlow, involving the excavation of 114,000 m3 of material over a five-year period. The project included a new splayed entrance, perimeter berms, and a wheelbath. Carlow County Council refused permission because the application did not provide sufficient scientific and technical data to demonstrate that the quarry would not adversely affect the integrity of nearby Europe...
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.