2560239

the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be captured), and a bio-based fertiliser from organic material. The total proposed gross floor area of the development (including internal plant areas and ancillary structures) will be c. 5,903 sq.m. The development will consist of the following: • Construction of 2 no. primary digesters (with an overall height of c. 9.1m), a pump house (with a gross floor area (GFA) of c. 279.8 sq.m), and 2 no. post digester tanks (with an overall height of c. 9.1m), located in the northeastern section of the site. • Construction of 2 no. prepits (c. 4.8m in height), a pasteurisation buffer tank (c. 4.8m in height), and a pasteurisation unit (with a maximum height of c. 4.2m), located west of the primary digesters, within the northern section of the site. • Construction of a digestate storage tank (c. 11.3 in height) located centrally on site, to the south of the primary and post digester tanks. • Construction of a digestate treatment building and a feedstock reception building (with a height of c. 12m and a GFA of c. 2,797.2 sq.m) with odour abatement system (with a height of c. 11m to odour abatement stack), located in the northwestern section of site. • Construction of combined heat and power (CHP) unit (c. 2.6m in height and c. 5.6m in height to flue, with a GFA of c. 38.53 sq.m), a biogas boiler (c. 2.6m in height and c. 5.6m in height to flue, with a GFA of c. 12.74 sq.m), a backup boiler (c. 2.6m in height), a gas treatment system (c. 4.2m in height), a biomethane compression system (c. 4.2m in height), and a safety flare (c. 11.3m in height), located south of the digestate storage tank, in the south-east section of the site. • Construction of a CO2 liquefactor (with an overall height of c. 10.7m to top of storage vessels), a propane tank compound accommodating 2 no. propane tanks (c. 1.6m in height), and an ESB substation (with a GFA of c. 23.5 sq.m and a height of c. 3.4m), located in the south-eastern section of the site. • Construction of roofed silage clamps (with a GFA of c. 2,424 sq.m and a height of c. 8.7m) and a fuel storage tank (c. 2m in height), located in the western section of the site. • Construction of a two storey office building (with a GFA of c. 327.4 sq.m and a height of c. 11m) within the western section of the site, adjacent to the site entrance. • Alterations to the adjacent local road including a new site entrance and access arrange

Refused

Core Refusal Reason

The proposed development would endanger public safety by reason of traffic hazard due to the generation of significant HGV traffic on a narrow and deficient local road network (L1214).

Decision Maker's Conclusion

  • The local road network, specifically the L1214, is considered inadequate in width and alignment to safely accommodate the volume of heavy goods vehicles (HGVs) generated by the facility.
  • The industrial scale and nature of the development would result in an unacceptable loss of residential amenity for nearby properties due to noise, odour, and general disturbance in a rural area.
  • The Environmental Impact Assessment Report (EIAR) provided insufficient information to demonstrate that the development would not have significant adverse effects on local water quality and biodiversity.

Cited Policies (CDP)

Objective TR O44Limerick Development Plan 2022-2028

Decision Document Summary

The proposal by CycleØ IE Limited involved the construction of a large-scale anaerobic digestion facility at Cappanihane, Bruree, Co. Limerick, designed to produce renewable biomethane, captured CO2, and bio-fertilisers. The development, with a total GFA of approximately 5,903 sq.m, included extensive infrastructure such as primary digesters, feedstock reception and treatment buildings, and a CHP unit. Despite the renewable energy objectives, the application was refused primarily due to traffic ...
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.