The installation of no.20 BESS containers 7.1m x 2.4m no. 15 Power converter stands 1.4 m x 1.2m. 1 MV switch room and transformer room 26m x 8m. Trench works and drainage as needed for cabling, no.7 CCTV and lighting poles 3.4m high and high security fence 2.4m surrounding the site. Hard standing reinforced concrete as foundation pad for whole site, laneway of 800mm stone from entrance of field to site approximately 590m

No decision recorded