2560354
for the erection of a guyed wind monitoring mast 120m in height, with instruments, and all ancillary works necessary for its construction and maintenance, for a period of six years. The purpose of the proposed mast is to assess the suitability of the surrounding area for wind farm development. Revised by Significant further information which consists of an auxiliary power system including wind charger 5 metres in height, underground cabling 12 metres in length, solar array and battery enclosure
Granted
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.