2560590

for a new commercial building consisting of cold storage areas, packaging areas, loading areas, offices and staff facilities as an extension to the existing commercial on-site food packaging and distribution business, decommissioning of existing septic tank system and installation of new on-site wastewater treatment system and percolation area, and a new surface water drainage system (SuDS), along with all ancillary works. Gross floor space of proposed works: 1,692.00 sqm

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.