2560268

A 10-year planning permission and a 40-year operational life for a solar energy development with a total site area of 157 hectares comprising (i) photovoltaic solar panels on steel mounting frames; (ii) electrical transformer stations; (iii) underground electrical and communications cabling within the proposed development site, private lands and within the carriageway of the L1501, L1505, L5610, L5611 and L5614 public roads; (iv) containerised battery energy storage facility; (v) the upgrade of 4 no. existing site entrances and development of 1 no. new site entrance; (vi) on-site access tracks; (vii) 4 no. temporary construction compounds; (viii) security fencing and gates; (ix) pole-mounted security cameras; and (x) all associated and ancillary site development, landscaping and reinstatement works. This planning application is accompanied by an Environmental Impact Assessment Screening Report and a Natura Impact Statement.

CONDITIONAL
Analysis not available for this case.

Inspector's Report Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.