2560566

10-year permission. The development will consist of (1) Integrated Constructed Wetland (ICW) type Wastewater Treatment Plant (WWTP) for the treatment of wastewater from the Grangemockler agglomeration comprising of 1 No. septic tank and 4No. ICW ponds; (2) Provision of a new terminal wastewater pumping station and stormwater management at the site of the existing Slievardagh Estate Developer Provided Infrastructure (DPI) WWTP, which is to be decommissioned; (3) Access road surrounding the ICW ponds; (4) decommissioning of 2 existing septic tanks (Mill River and Lingaun Park); (5) Ancillary works associated with the development including the associated pipework, fencing and landscaping; (6) pedestrian access via new footbridge over the Currasilla Stream; (7) upgrade existing culvert bridge under existing access road; (8) the installation of a ground mounted solar photovoltaic (PV) array. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with this application.

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.