2560646

proposed upgrade works to existing flood defences consisting of the construction of 1.1m – 1.8m sheet pile wall to act as a flood barrier from the River Shannon and Mulkear River; associated drainage works including new drainage trenches, pipes and attenuation pond; construction of 11 no. mammal crossings comprising earth ramps filled to the top of the proposed sheet piles along the River Shannon and Mulkear River; Localised relocation of an existing boundary fence to the adjacent Johnson and Johnson facility to facilitate the proposed development; Removal of existing berm along the Mulkear River; All associated ancillary site development works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies this planning application

No decision recorded
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.