2560508

demolition of the existing derelict dwelling (64.7 sq m) and outbuildings (145.8 sq m); and the construction of a residential scheme comprised of 10 No. 4-bed houses. The proposed houses are 2-storey plus dormer attic in height and total 1,630 sq m gross floor area. The development also includes: 22 No. car parking spaces; cycle parking; hard and soft landscaping, including public open space and private gardens; public lighting; boundary treatments; internal roads; reconfiguration of existing entrances at L5046 to provide a single multi-modal entrance; and all associated works above and below ground

Refused

Core Refusal Reason

The development was deemed premature pending the finalization of the N11/M11 road improvement scheme and was considered visually inappropriate for the gateway location of Kilpedder village.

Decision Maker's Conclusion

  • The proposal is premature as the site falls within the buffer zone for the future N11/M11 Junction 4 to 14 road improvement scheme, and permitting development could prejudice the delivery of this national infrastructure.
  • The design and scale of the residential scheme are considered unsympathetic to the character of the existing development at this gateway entry point to Kilpedder, resulting in a negative visual impact.
  • Significant road safety concerns exist regarding traffic intensification at the L5046 junction with the N11 off-slip, where existing sightlines are inadequate and a comprehensive Road Safety Audit was not provided.

Cited Policies (CDP)

Objective TR18Objective TR19CPO 4.13CPO 6.37CPO 14.14CPO 4.3CPO 6.1CPO 6.3CPO 6.4CPO 6.13CPO 6.14

Decision Document Summary

Dublin Letting and Management Ltd proposed the demolition of a derelict dwelling and outbuildings to construct a 10-unit residential scheme at Willow Cottage, Johnstown, Kilpedder, Co. Wicklow. The site is situated at a sensitive gateway to the village, immediately adjacent to the N11 dual carriageway. The application was refused primarily because the site is located within the preferred corridor for the M11/N11 Junction 4 to 14 Improvement Scheme, making development premature until the road des...
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.