2560715

alterations and an extension to the third floor of the existing hotel to provide for a new spa with outdoor thermal area as follows: (i) removal of 2 no. bedrooms at 3rd floor level to provide a spa / thermal area (244 sq.m) including elevational alterations as necessary, (ii) provision of a spa reception area, 3 no. changing rooms and lockers, 1 no. guest WC, 1 no. accessible WC, a rasul (heat experience) with accompanying shower in the anti-chamber; (iii) extension of the spa / thermal facilities out to the Rooftop terrace (156 sq.m) at the same level to the east of the existing hotel to provide an outdoor thermal experience with a sauna, plant room, hydrotherapy pool, hot tubs, cold plunge pool, 2 no. showers, and 4 no. seaweed baths; and (iv) all other associated engineering works, drainage, landscaping, lighting, and ancillary works necessary to facilitate the development

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.