2560920

for the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be captured), and a bio-based fertiliser from organic material. The total gross floor area of the proposed development (including internal plant areas and ancillary structures) will be c. 6,007 sq.m. The development will consist of the following: Construction of 2 no. primary digesters (with an overall height of c. 9.1m), a digestate storage tank (with a height of c. 11.3m), a pump house (with a gross floor area (GFA) of c. 362 sq.m), 2 no. post digester tanks (with an overall height of c. 9.1m), and a safety flare (c. 11.3m in height), located in the southeastern section of the site. Construction of 2 no. prepits (c. 4.3m in height), a pasteurisation buffer tank (c. 4.3m in height), and a pasteurisation unit (with a maximum height of c. 4.2m), located to the west of the primary digesters, within the southern section of the site. Construction of digestate treatment and feedstock reception building and odour abatement system (with a GFA of c. 2,797 sq.m and a height of c. 12.1m and c. 16.2m to top of odour abatement stack) located within the southwestern section of the site. Construction of roofed silage clamps (with a GFA of 2,424 sq.m and a height of c. 8.7m) and a fuel storage tank (c. 2m in height), located within the western section of the site. Construction of a combined heat and power (CHP) unit (with a GFA of c. 39 sq.m and a height of c. 2.6m and c. 5.6m to top of flue), a biogas boiler (c. 2.6m in height and c. 5.6m in height to top of flue), a backup boiler (c. 2.6m in height), located within the northern section of the site. Construction of a gas treatment unit (c. 4.2m in height), a grid injection unit (with a GFA of c. 22 sq.m and a height of c. 2.8m), and a CO2 liquefactor (with an overall height of c. 10.7m to top of storage vessels) a propane tank compound accommodating 2 no. propane tanks (c. 1.6m in height), and an ESB substation (with a GFA of c. 24 sq.m and a height of c. 3.4m), located within the northern section of the site. Construction of a two storey ancillary administration building (with a GFA of c. 327 sq.m and a height of c. 11m) within the northern section of the site, adjacent to the site entrance. Alterations to the adjacent local road and site access road, including junction improvement and widening and site entrance and access arrangements. Associated and ancillary works including parking (9 no. standard, 2 no. EV and

Refused

Core Refusal Reason

The development was refused due to the substandard local road network, non-compliance with motorway setback requirements, and insufficient environmental assessments regarding the protection of the River Barrow and River Nore SAC.

Decision Maker's Conclusion

  • The L8050 local road is substandard in width and alignment, and the scale of traffic generated would create a significant traffic hazard and endanger public safety.
  • The proposal infringes the 91m building line setback from the M9 motorway, which would set an undesirable precedent and run counter to strategic transport protection objectives.
  • The applicant failed to demonstrate beyond reasonable scientific doubt that the development would not adversely impact the integrity of the River Barrow and River Nore SAC and other hydrologically linked sites.

Cited Policies (CDP)

Section 9.3Objective TM O62Objective TM O71Objective TM O73Objective TM O77Policy TM P7Policy IN P4Objective IN O22Objective IN O23Objective IN O24Policy EC P1Policy EC P2Objective EC O2Objective EC O3Objective EC O4Objective EC O9Policy EC P8Objective EC O33Policy EC P13Objective EC O41Policy EC P21Objective EC O89Objective EC O90Policy RD P1Objective RD O1Objective RD O2Objective RD O3Objective RD O5Objective RD O6Objective RD O7Policy AH P1Policy AH P2Objective AH O2Objective AH O3Objective AH O5Policy BI P8Objective BI O6Objective BI O9Objective BI O45Objective BI O49Objective LR O4Objective LR O15Section 15.7.7Table 15.7

Decision Document Summary

CycleØ IE Limited proposed the construction of an anaerobic digestion facility to produce renewable biomethane and bio-based fertilizer at Ballyvass, Castledermot, Co. Kildare. The site is situated in a rural agricultural area bounded by the M9 motorway. The application was refused by Kildare County Council because the local road network is inadequate for the required HGV movements, the structures encroached upon the motorway's protected building line, and the environmental documentation failed ...