25299
the construction of an extension at the side of dwelling, a dormer first floor extension to the existing dwelling and a new wastewater treatment system and all associated site works. Retention Permission is also sought for the construction of an extension at the rear of the existing dwelling.
Granted
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.