2561050

for • Linear arrays of solar PV panels on ground mounted steel supported structures with associated cabling and ducting; • 4 no. proposed single storey inverter stations; • All associated underground cabling (within and between land parcels), including onsite control and switch gear room; • Site Perimeter fencing; • 2 no. new site entrances with palisade double security gates; • 2 no. temporary construction compound/carpark/material storage areas with associated temporary site offices, parking areas and security fencing; • 3 no. temporary and 1 no. permanent steel storage containers; • Site access tracks including passing and turning bays; • On-site pole mounted CCTV cameras; • 2 no. bottomless culverts; • 2 no. temporary construction stage Moby Dick type wheel wash systems; • 1 no. Concrete wash out location (within the westernmost temporary construction compound); and • All associated and ancillary works. The proposed solar farm development spans a total site area measuring 60.36 ha, of which 37.66 ha is located in Co. Kildare and 22.7 ha is located in Co. Laois. Permission is sought for a period of 10 years with an operational period of 40 years. The total capacity of Solar PV on the site is estimated to be 32 MW

No decision recorded
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.