2560594

for (i) A new above-ground, treated water service tank with a usable storage capacity of 722 M3 with an overall height of 6.4m (5.3m without safety railings) including: a) Concrete tank; b) Duel compartment; c) Connection pipework; d) Scour and overflow pipework; e) Dechlorination chamber; f) Handrailing and access staircase; (ii) Ancillary works, including: (a) Associated ground works; (b) Vehicle access track, security gate, footpaths, and vehicle turning Below-ground dechlorination chamber; (c) Mechanical and electrical service connections; (d) Modifications to the existing electrical control system to support new works; (e) Extension to the existing high fence around the existing storage site, to incorporate the expanded site; (iii) Solar PV panels to area; to be mounted on the new service reservoir roof slab (static and south-west facing); (iv) Associated temporary works including temporary compound area for the construction period; (v) Associated works including landscaping and biodiversity net gain. There are no demolition works proposed as part of this Project. In addition, a Landscaping and Biodiversity Net Gain (BNG) Plan has been prepared as part of the proposed development. Refer to Volume 2, Drawing No. 20788-NOD-04-XX-DR-C08015 for a copy of the Landscape Plan. Planting shall commence in the first planting season following commencement of development on the site

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.