2560634

carry out work on house which is a protected structure. Development will consist of; Refurbishment of the house to conservation standard; Integration of the adjoining shed into the dwelling with new single-storey connecting link of 6m2; Rebuilding of a ruined outbuilding with 6 no. solar panels on its roof; New waste water treatment system.

No decision recorded
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.