25130
A PERIOD OF 10 YEARS, WITH AN OPERATIONAL LIFE OF 40 YEARS FROM THE DATE OF COMMISSIONING. THE PROPOSED DEVELOPMENT COMPRISES OF A SOLAR PHOTOVOLTAIC (PV) FARM AND ALL ASSOCIATED WORKS. THIS APPLICATION INVOLVES THE INSTALLATION OF 145MW OF SOLAR PV OVER AN APPROXIMATE AREA OF 148 HECTARES, INCLUDING 41 NO. TRANSFORMERS AND 1 NO. RMU. THE PROPOSED DEVELOPMENT WILL UTILISE 1 NO. EXISTING CONSTRUCTION ENTRANCE, AND 2 NO. EXISTING OPERATIONAL ENTRANCES. THE PROPOSED DEVELOPMENT WILL UTILISE EXISTING INTERNAL ACCESS TRACKS AND WILL INVOLVE THE CONSTRUCTION OF APPROXIMATELY 7KM OF NEW INTERNAL ACCESS TRACKS. THE SITE IS CENTRED AT X (ITM) 608494.8003 AND Y (ITM) 716388.2449. A NATURA IMPACT STATEMENT WILL ALSO BE SUBMITTED TO THE THE PLANNING AUTHORITY WITH THIS APPLICATION. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE 2023/2413).