2561838

for the erection of a 15 m telecommunications structure supporting 4 no. receiving dishes, dual bay cabinet on concrete foundation, palisade fence with access gate, concrete plinth, white stone compound ground finish, and all ancillary development works. The development is required to carry the broadband data from the new high speed fibre broadband network on the island to the mainland by radio link to connect to the NBI national fibre network as part of the government’s national broadband plan to provide high speed broadband to all parts of the country that are not available commercially, including the islands, at the same data speed. A Natura Impact Statement (NIS) has been prepared and submitted in support of this planning application

Refused

Core Refusal Reason

The application was refused due to insufficient information regarding environmental impacts on a Special Area of Conservation (SAC), failure to justify the need for a new mast over co-location with existing infrastructure, and negative visual impacts on an iconic landscape.

Decision Maker's Conclusion

  • The planning authority was not satisfied that the development would not adversely affect the integrity and conservation objectives of the Inisheer Island SAC, particularly regarding the lack of detail for the proposed translocation of habitat.
  • The applicant failed to provide adequate documentary evidence to demonstrate that co-location with the existing nearby telecommunications structure was non-feasible, leading to an unnecessary proliferation of masts in a sensitive area.
  • The proposed 15m structure would result in a significant negative visual impact on the Class 4 Iconic landscape of Inis Oírr and lacked sufficient information regarding the nature and impact of the proposed access route.

Cited Policies (CDP)

Objective ICT 1Objective ICT 4Objective ICT 5DM Standard 42Policy Objective NHB 1Policy Objective NHB 2Policy Objective NHB 3DM Standard 50Policy Objective LCM 2Policy Objective LCM 3DM Standard 46Policy Objective NNR2Policy Objective NNR6

Decision Document Summary

NBI Infrastructure DAC proposed the construction of a 15m telecommunications mast and associated equipment at Baile an Chaisleain, Inis Oírr, Co. Galway. The site is situated within the Inisheer Island SAC and a Class 4 Iconic landscape. Galway County Council refused permission on four grounds: potential adverse effects on the SAC due to inadequate mitigation details, failure to justify the need for a new structure over co-location with an existing nearby mast, significant negative visual impact...
SOURCE PDFOpen Original