2660047

for the removal of five existing prefabricated buildings to the east of the school site and construction of a replacement two-storey extension with a link to the existing school buildings. The link will include a new main entrance to the school, circulation and ancillary offices. The two-storey extension will provide replacement accommodation for the previous prefabs, including 4 no. Specialist Classrooms (Art/Craft Room, Tech Room, Home Economics, and Science Laboratory) with associated support rooms, sanitary accommodation and circulation areas. Site works will include; the realignment of the existing entrance gates and front boundary wall to facilitate a revised, widened entrance gate and new bus set-down area parallel to the main road, provision of rear courtyard and amenity space to the east, construction of new retaining walls, a new internal access road and footpaths, provision of onsite bicycle and accessible parking and static water storage tank, along with all required site development works

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.