- Replacement of existing double height external timber screens & doors to gym hall with a glazed curtain walling system with solid aluminium spandrels and doors; - Replacement of existing high level external single glazed system to the gym hall with double glazed curtain wall system; - Installation of 2 x Air Source Heat Pumps with 2.8m high perimeter screen enclosures; - Installation of a vandal resistant EVC car charging local electrical enclosure, distribution board and dual car charging outlet.
Granted