(1) INCREASE IN RIDGE HEIGHT OF PART OF THE DWELLING HOUSE TO MATCH WITH THE HIGHER ROOF LINE, (2) ALTERATION OF EXISTING FLAT ROOF TO A PITCHED ROOF AT THE FRONT OF THE DWELLING HOUSE AND (3) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS