4057/23
The development will consist of construction of a new 220kV gas insulated switchgear (GIS) Switchboard building measuring 65.2 x 51.8m and 17m high; construction of 2no. new shunt reactor units (each within a 4.3m x 8.2m x 5.5m enclosure) and 1no. new series reactor unit (within a 4.7m x 12.7m x 16.6m enclosure), associated connections to the 220kV GIS switchboard building an decommissioning and removal of 2no. existing shunt reactors; an extension of the existing internal access road around the new GIS switchgear building and 4no. car parking spaces; all ancillary and associated works to facilitate the development including removal of existing perimeter berm and new 2.6m high boundary fence around extended substation compound, perimeter planting, 3m high lightning protection to new GIS switchboard building, surface water drainage network including an attenuation pond, lighting and laying of 2 temporary cable circuits for the construction and commissioning period connection the existing AIS building to the new GIS switchboard building and all other associated site excavation, raising of site levels, infrastructural and site development works above and below ground. Planning permission is sought for a period of 10 years. A Natura Impact (NIS) will be submitted to the Planning Authority with the application .
Core Planning Reasoning
The Inspector recommended upholding the financial contribution condition because the development falls within the 'Industrial/Commercial' category of the Dublin City Council Development Contribution Scheme 2023-2026 and does not qualify for any specific exemptions listed under the scheme.
Decision Maker's Conclusion
- The Dublin City Council Development Contribution Scheme 2023-2026 categorizes development into only two classes: residential or industrial/commercial; the subject proposal is found to fall into the latter as an industrial use.
- The applicant is not considered a statutory undertaker as per the definition in the Planning and Development Act 2000, and the proposal does not meet the criteria for exemptions or reduced contributions under Section 10 of the scheme.
- The Planning Authority correctly applied the terms of the scheme, and Condition No. 2, requiring a payment of €659,178.80, should be attached to the grant of permission.
Cited Policies (CDP)
Decision Document Summary
The proposal involves the construction of a new 220kV Gas Insulated Switchgear (GIS) switchboard building (approx. 5,558 sq.m.) and associated infrastructure at the Poolbeg Substation, Pigeon House Road, Dublin 4. EirGrid lodged a first-party appeal against Condition No. 2 of the grant of permission, which required a financial contribution of over €659,000. The appellant argued that as strategic electricity infrastructure, the project should be classed as a 'public service installation' and not ...PDF Document Missing