2660114

1) The construction of a 6.1m high single storey extension with a floor area of 176m2 for the Pack-Off area located at the southeast corner of the existing production facility; 2) The construction of a 14m high new fire escape staircase of 55.4m2 connecting the ground floor, mezzanine and roof located at the southeast corner of the existing warehouse at Abbvie Ballytivnan facility; and 3) External galvanised steel fire escape stairs to south elevation of existing warehouse to provide fire escape from new Pack-Off roof and existing mezzanine to ground floor level.

No decision recorded
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.