(1) DEMOLITION OF THE EXISTING SINGLE STOREY EXTENSION DUE TO DEFECTIVE CONCRETE BLOCKWORK AND (2) CONSTRUCTION OF A TWO STOREY EXTENSION TO THE SIDE OF THE DWELLING TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS