4105/23
PROTECTED STRUCTURE: the site is within the curtilage of 16 Fitzwilliam Square East, Dublin 2. The development will consist of : 1. removal of the existing fibre cement slate roof & replacement with natural slate roof (including 1no new rooflight to south side of roof) to the existing mews building, 2. reconfiguration & replacement of the windows & doors to front (south) elevation of the existing mews building, 3. removal of the existing internal walls & floors of the existing mews building, 4. construction of new internal layouts and 37sqm ground floor extension to the existing mews building, 5. the extension & refurbishment of the mews building will provide a 1no. 4 bedroom house.
Decision Document Summary
No text availablePDF Document Missing
The original decision document for this case could not be linked. This often happens for older cases or those with restricted documentation.