2660276
develop the following infrastructure: • Demolition of an existing section of boundary wall (6.5m length) at the existing wastewater pumping station (Ballacollig WWPS) site • Removal of existing kerb and verge at access gate location • Relocation of existing lamp post • New 6.5m long, 2.4m high double leafed palisade access gate • New access ramp within existing wastewater pumping station (Ballacollig WWPS) site to allow vehicle access
Granted
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original