(1) RETENTION OF (A) DETACHED GARAGE AND (B) SEPTIC TANK SYSTEM WITH ASSOCIATED DRAINAGE AND (2) DEMOLITION OF EXISTING DWELLING HOUSE CONSTRUCTED WITH DEFECTIVE CONCRETE BLOCKWORK AND CONSTRUCTION OF A REPLACEMENT DWELLING HOUSE AND ASSOCIATED SITE DEVELOPMENT WORKS