23239
The development will consist of the restoration of an area of a disused Sand and Gravel Pit, back to agricultural use. The proposed site covers approximately 6.4 hectares and approximately 116,000 cubic metres (185,600 tonnes) of uncontaminated soil and stone is to be imported under a Waste Facility Permit over a period of 8 to 10 years. A maximum of 5 loads per day will be delivered to the facility Monday to Friday, no waste will be accepted at the weekend or on Bank Holidays. The maximum annual tonnage to be accepted will be 20,000 tonnes so an EIAR is not required
No decision recorded
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original