(1) DEMOLITION OF EXISTING (DEFECTIVE/MICA) DWELLING, (2) CONSTRUCTION OF A NEW REPLACEMENT DWELLING WITH MINOR ALTERATIONS TO THE ELEVATIONS AND (3) CONNECTION TO EXISTING SITE SERVICES AND ALL ASSOCIATED SITE WORKS