(A) DEMOLISH EXISTING SINGLE STOREY STRUCTURE (B) CHANGE OF DESIGN FROM A STOREY AND A HALF EXTENSION TO A SINGLE STOREY EXTENSION AT SIDE OF EXISTING DWELLING (C) NEW GARAGE AND (D) DECOMMISSION EXISTING SEPTIC TANK AND INSTALL A NEW SEPTIC TANK AND PERCOLATION AREA.