2361008

for the development that will consist of grid connection infrastructure to connect the approved solar photovoltaic (“PV”) energy development on lands at Ballymoneen & Grange East Co. Galway under register references 20/961 & 22/61105 to the ESB Cashla 220kV Substation, Cashla, Co. Galway comprising the laying of c. 6,610 metres of 110kV underground electricity cables (3no.) & communications cable in ducts (6no.) & associated infrastructure substantially under public roads & under an existing underground gas main by means of horizontal directional drilling

Refused

Core Refusal Reason

The application was refused primarily due to the lack of demonstrated landowner consent for the entire cable route and the potential for extensive roadworks to create traffic hazards and endanger public safety on restricted regional and local roads.

Decision Maker's Conclusion

  • The applicant failed to demonstrate sufficient legal interest or obtain necessary third-party consents for the lands encompassing the public road network along the proposed 6.61km route.
  • The proposed development, involving significant works on Restricted Regional and Local roads (R-339, LT-31026, LS-7117), would interfere with the safety and transport function of the public road network, creating a traffic hazard.
  • The proposal is at variance with specific County Development Plan policy objectives (NNR 1 and NNR 2) regarding the safeguarding of regional and local roads and lacks adequate prior consultation with the Roads and Transportation Department.

Cited Policies (CDP)

Policy Objective EG 1Policy Objective EG 2Policy Objective EG 4Policy Objective NBH 1Policy Objective NHB 3Policy Objective FL 1Policy Objective LCM 2Policy Objective LCM 3Policy Objective WR 1Policy Objective NNR 1Policy Objective NNR 2Policy Objective WW 11DM Standard 33DM Standard 41DM Standard 46DM Standard 50DM Standard 67

Decision Document Summary

Ballymoneen Project Ltd sought permission for 6.61km of 110kV underground grid connection infrastructure to link an approved solar PV farm to the ESB Cashla Substation across several townlands in rural Co. Galway. While the principle of the development was generally acceptable under renewable energy policies, Galway County Council refused the application. The refusal was based on the applicant's failure to provide evidence of landowner consent for the entire route and concerns that the extensive...