2360548
Incorrect submission process please See Pl. Ref. 23/218 [Extension of the Appropriate Period for a deep-water quay which will provide 200metres of outside berthing frontage at Rossaveel Harbour. A reclamation area will also be constructed directly behind the deep-water quay which will provide a hard surfaced link to the existing onshore. The development will also include low concrete sea walls, a rock armour revetment, access road, lighting, drainage infrastructure and other ancillary site works. An Environmental Impact Statement was prepared for this development and was included with the original planning application. Gross floor area 66,800m² including navigation channels in the townland of Rossaveel]