22/207
Permission for retention for the installed 12m Dia. X 4.27m high overground steel slurry tank constructed to the East of the existing farmyard complex and Planning Permission for an On-farm Biogas Plant consisting of the following works: (a) Construct New 600 cubic meter biogas plant constructed within the existing concrete slurry tank, raising the wall height of the existing concrete slurry tank and complete with concrete roof. (b) Installation of a 4m membrane dome cover onto the existing 12m Dia. Overground steel slurry tank, giving an overall tank height of 8.27m. (c) Containerised prefabricated office/control cabin to the North of the proposed new biogas plant. (d) All associated site works.
No decision recorded
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.