22/323

Proposed works to include: 1) decommissioning of existing septic tank on site and installation of new waste water treatment system to serve existing dwelling house; 2) demolition of existing shed adjoining the dwelling house to the west and construction of new storey-and-half extension to the west (side) of the existing dwelling house; 3) minor alterations to existing elevations; 4) all ancillary site works

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.