22/5488

The construction of a residential development consisting of 63 no. dwelling houses and all ancillary site works. The proposed development comprises of 7 no. terraced 2 bedroom dwelling houses, 1 no. detached 3 bedroom dwelling house, 12 no. semi detached 3 bedroom dwelling houses, 40 no. terraced 3 bedroom dwelling houses, 3 no. detached 4 bedroom dwelling houses, and ancillary site works include landscaping, surface car parking and site services. This permission also includes the omission of 3 no. dwelling houses from that permitted under planning reference 20/6323.

Granted

Core Planning Reasoning

The proposed development is considered to be in accordance with the proper planning and sustainable development of the area as it complies with the 'Established Residential/Mixed Residential and Other Uses' zoning objective, integrates with the existing pattern of development in Cobh, and would not seriously injure residential amenities or create a traffic hazard.

Decision Maker's Conclusion

  • The principle of residential development is established and acceptable given the site's zoning and its context as the final phase of the larger Cooline landholding.
  • Potential impacts on residential amenity, specifically concerning overlooking and site stability on the steeply sloping site, can be adequately managed through engineering solutions and adherence to technical conditions.
  • The provision of a pedestrian link to the Ard Aoibhinn estate is a positive design feature that enhances urban permeability and connectivity to Cobh town center in line with national and local policy.

Cited Policies (CDP)

Cork County Development Plan 2022-2028Section 2.5.1Section 2.5.9Objective ZU 18-9Objective HOU 4-7Table D2: Settlement Specific Key InfrastructureSection 12.7.10

Decision Document Summary

The proposal consists of a residential development originally for 63 dwellings (amended to 56 units) on an 1.84-hectare landlocked, steeply sloping site in Ballyvoloon, Cobh. The site is a vacant, underutilised infill area surrounded by existing residential estates. Key arguments centered on the impact of significant 'cut and fill' groundworks required for the sloping terrain, pedestrian connectivity to the adjacent Ard Aoibhinn estate, and the necessity of a childcare facility. Third-party appe...
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.