22/5563
The demolition of the existing dwelling and two outbuildings, the construction of a new replacement dwelling with adjoining outbuilding, the creation of a new site access with new gates and pillars, a new wastewater treatment system and associated site works. The existing site entrance is to be closed off with a new hedge.
Granted
Analysis not available for this case.
Decision Document Summary
No text availableSOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.