3385/24

PROTECTED STRUCTURE The works will include the following: 1) Removal of cement pointing, and re-pointing part of the external west façade in lime mortar. 2) Repair of external iron railings and stone steps, together with replacement of concrete path with stone paving. 3) Replacement of four existing non-compliant ramps, with four new compliant ramps. 4) Replacement of recently installed fixed furniture and loose screens in the north transept with new movable furniture to create a secure choristers robing area. 5) Removal of sand and cement plaster from north choir aisle and replacement with lime plaster.

Granted
Analysis not available for this case.