22/6231

Permission for a new detached dwelling, domestic waste water treatment system, site entrance and associated site works.

Refused

Core Refusal Reason

Failure to demonstrate a genuine rural-generated housing need in an area designated as being under strong urban influence.

Decision Maker's Conclusion

  • The site is located within a 'Rural Area under Strong Urban Influence' where significant pressure for rural housing exists.
  • The applicant failed to demonstrate a genuine rural-generated housing need based on social or economic links to the local area.
  • The proposed development would materially contravene Objective RP 5-4 of the Cork County Development Plan 2022.

Cited Policies (CDP)

RP 5-4

Decision Document Summary

The proposal sought permission for a new detached dwelling and domestic waste water treatment system at Ballyknock, Ballynoe, Mallow, Co. Cork. The site is situated in a rural area identified as being under strong urban influence, requiring applicants to prove a specific social or economic need to reside in the locality. The Planning Authority refused the application as the documentation submitted did not satisfy the criteria for rural-generated housing need set out in the Cork County Developmen...
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.