22/6368

(i) The construction of 17 number dwellings; 4 number two storey semi-detached dwellings; 3 number two storey terraced dwellings and 10 number two & three storey detached dwellings. Each dwelling is served by a rear garden private amenity space, on site and or street side car parking. House no's 53,55,57,59 to have 2 house type options available, type 5A & 5 B for house no's 53,57 & 59 and type 5C & 5E for house no. 55. (ii)The construction of two number single storey detached garages at house no's 45 & 59. (iii) Provision of public open space to serve the development (shared with the existing Ard Caladh estate), street lighting, internal roadways with connection to Upper Cork Hill via the existing road network within the completed Ard Caladh and Cnoc Aoibhinn & Gort Aoibhinn estates, footpaths, foul and SUD's surface drainage, landscaping & boundary treatments and all ancillary infrastructural and engineering works necessary to facilitate the development.

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.