PWSDZ3461/24

For development, comprising modifications to a permitted mixed-use development (referred to as Phase 1). The subject lands include two sites of c. 678 sq m and c. 25 sq m (identified, respectively, on the Site Layout Plan) and are identified as being within the A3 Lands in the Poolbeg West Strategic Development Zone (SDZ) Planning Scheme (April 2019). The wider site also includes the lands known as the Former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4. The modifications relate to the roof levels of Block K and Block M, permitted under Dublin City Council Planning Reference PWSDZ3207/21 (and amended through Planning Reference PWSDZ4276/23). The proposed development consists of the installation of air source heat pump plant on the roof of Block K (max height c. 0.83 m above roof parapet level), associated flue at the roof of Block M (max height c. c 0.63 m above roof parapet level), ancillary louvre screening, and all other associated and ancillary works.

Granted
Analysis not available for this case.

Decision Document Summary

No text available
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.

PDF Document Missing

The original decision document for this case could not be linked. This often happens for older cases or those with restricted documentation.