22/6829
Construct an extension to the existing Whitegate Regional Water Treatment Plant. These works will include the construction of a single storey treatment building with solar PV roof panels, 9 no. above-ground tanks, 3 no. below-ground tanks, 1 no. ESB substation building, 1 no. control kiosk building, 1 no. attenuation pond, 1 no. generator and fuel storage tank, the realignment of the existing access from the public road with road markings and road signs, boundary fence and security gate, drainage network and all other site development works including existing container to be relocated.
Core Planning Reasoning
The proposed development is considered beneficial for public health as it addresses critical drinking water quality issues and will not seriously injure the amenities of the area, property, or traffic safety, thereby according with proper planning and sustainable development.
Decision Maker's Conclusion
- The principle of development is acceptable as it prioritises the supply of adequate sustainable drinking water and addresses urgent public health issues (boil water notices) surrounding the Whitegate Regional Water Supply Scheme.
- The visual impact on the high-value landscape is deemed acceptable given the presence of existing infrastructure, including the current treatment plant and telecommunication masts, supplemented by proposed native hedgerow screening.
- Access and traffic concerns are adequately mitigated through road safety audits and construction management plans, with the proposed 3.5m access width considered sufficient for emergency and HGV vehicles.