23/130

A wind farm with an operational lifespan of 30 years, from commissioning, which will connect to the national grid. The proposed wind farm will consist of 7 no. wind turbines with blade tip heights of up to a maximum of 150 metres, and associated foundations and hardstand areas. The proposed development includes a site substation compound with security fencing and a single storey control building and associated loop-in infrastructure to tie into an existing 38kV overhead transmission line, underground cabling, drainage and service infrastructure, bored well, 1 no. permanent meteorological mast of 92 metres in height, tree felling and a temporary construction compound. The development includes landscaping and all associated ancillary development works. Vehicular access will be via an upgraded existing site entrance off the L8456 local road with provision made for the upgrade of existing on-site tracks and the construction of new on-site access roads. It will also include widening of two junctions along the turbine delivery route. The first is at the N71 - R592 junction in Knockroe townland, east of Ballydehob. These works will consist of the temporary removal of a section of masonry wall, public street lighting stanchion, gate, gate posts, trees and earthern berm and the raising of levels with engineered fill to that of the adjacent N71. The second is at the N71 - L8456 junction in Shronagree townland. These works will consist of the lowering of ground levels to that of the adjacent N71 and L8456 and the removal of traffic signage. Both locations to be restored following turbine delivery. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared and will be submitted to the Planning Authority with the application.

Refused

Core Refusal Reason

The proposed wind farm was refused due to significant negative impacts on high-value ecological habitats and its inappropriate location within a 'Normally Discouraged' wind energy zone and 'High Value Landscape', which would result in unacceptable visual intrusion and environmental degradation.

Decision Maker's Conclusion

  • The development would likely result in permanent significant negative effects on habitats of high ecological value, directly contravening the biodiversity protection objectives of the Cork County Development Plan 2022.
  • The siting of six turbines and associated infrastructure within an area designated as 'Normally Discouraged' for wind energy and 'High Value Landscape' fails to demonstrate the exceptional circumstances required to justify such a development.
  • The scale and elevated ridgeline location of the turbines would create a visually domineering and obtrusive presence, eroding the natural character of the West Cork Peninsulas and harming the scenic amenities of the Wild Atlantic Way tourism route.

Cited Policies (CDP)

Objective BE 15-2Policy Objective ET 13-8Policy Objective GI 14-9Policy Objective GI 14-12Policy Objective GI 14-13Policy Objective GI 14-14Policy Objective TO 10-5

Decision Document Summary

This application sought permission for a wind farm with a 30-year operational lifespan across several townlands in West Cork, including Shronagree and Ballybane East. The proposal included seven turbines, a substation, and grid connection infrastructure. Cork County Council refused the application on two primary grounds: first, the ecological damage to high-value habitats; and second, the significant visual impact on a highly sensitive landscape. The site is located within a 'Normally Discourage...
SOURCE PDFOpen Original
Note: If code appears below, the council site is blocking the preview. Please open the original file.