23/4450

Permission for the following Large Scale Residential Development (LRD) comprising the construction of 125 no. residential units, 21 no. garden sheds, 1 no. creche, 2 no. ESB substations, a temporary wastewater treatment plant and all associated development works including footpaths, parking, drainage, bicycle and bin stores and landscaping/amenity areas at Maple Woods, Ballynacorra(townland) Ballynacurra, Midleton. Access will be via the existing Maple Woods entrance onto the R630. A Natura Impact Statement is submitted to the planning authority with this application. The Natura Impact statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the office of the planning authority

Granted

Core Planning Reasoning

The Inspector recommended granting permission (reversing the 'refusal' premise in the prompt) as the development is consistent with the 'Existing residential/Mixed Residential and Other Uses' zoning objective in the Cork County Development Plan 2022-2028, provides appropriate density for an inner suburban/infill site, and includes acceptable temporary infrastructure to manage wastewater constraints.

Decision Maker's Conclusion

  • The proposed development is consistent with the Cork County Development Plan 2022-2028 and national guidelines for sustainable residential development, providing a suitable density of 38.3 units per hectare on zoned lands.
  • The design and layout adequately respect the amenities of adjoining properties, with sufficient separation distances and boundary treatments to prevent undue overlooking or overbearing impacts on neighboring agricultural and residential lands.
  • The use of a temporary wastewater treatment plant is a justified interim measure to address current capacity constraints in the Midleton network, provided it is decommissioned upon the completion of planned public infrastructure upgrades.

Cited Policies (CDP)

Objective ZU 18-9 (Existing Residential/Mixed Residential)Objective HOU 4-7 (Medium A density)Objective GI 14-3 (Green Infrastructure Strategy)Section 14.5.11 (Public Open Space Provision)Section 14.5.15 (Private Open Space Standards)Table 12.6 (Car Parking Requirements)Table 12.9 (Cycle Parking Standards)Objective BE 15-1 (Biodiversity Protection)Objective BE 15-8 (Trees and Woodlands)Objective WM-1 (Water Management)Objective WM 11-10 (SUDS)Section 4.10.6 (Building Height)

Decision Document Summary

The proposal involves 125 residential units (117 houses and 8 maisonettes) and a 60-space crèche on a 3.75-hectare site at Maple Woods, Midleton. The site is a greenfield extension of the existing Maple Woods housing estate. A primary constraint identified was the lack of capacity in the Midleton Wastewater Treatment Plant; the applicant proposed a temporary on-site treatment system as a solution, which was accepted by Uisce Éireann and the Inspector. A third-party appeal from a neighbor raised ...